Source: 56th WGSE meeting, 10-14 May 2010, Tromsø, Norway (54SE(10)-Annex05)

 

On-line ECC work programme base here  or alternatively see below:

 

WG SE Work Programme, May 2010 – September 2010

 

SE WP Ref#

Subject

Output

Start/Target dates[1]

Allocated

Remarks

ECO support (Y/N)

SE7_11

GSM Multicarrier Base Stations

A technical report on the coexistence analysis between GSM MCBTS and:

  • any system operating in the 1800-1805 MHz band (formerly allocated to TFTS)
  • military systems (915 MHz – 935 MHz)

S: Jan 2009

T: May 2010

SE7

PC completed, responses sent to ECC PT1 for ECC to finally adopt. WI closed

Y

SE7_12

Practical guidance on co-ordination between GSM-R and public networks

ECC Report

S: Sep 2009

T: feb 2011

SE7

SE7 is to liaise with ECC PT1.

 

LS sent to WG FM with  clarification on the WI.

 

Y

SE19_22

High Altitude Platform Stations (HAPS) in the range 5 850- 7 075 MHz

Support of the WRC-11 CPG-PTD agenda item 1.20. To liaise directly to CPG-PTD.

Draft ECC Report.

S: May 2008

T: Feb 2011

SE19

Sharing between HAPS and primary services with the aim to ensure protection of existing services including conventional fixed stations. Correspondence activities to provide support to CPG-PTD.

Y

SE19_23

Review of ECC/ERC Recommendations

Response to the mandate from WG FM.

S: Sep 2008

T: Jan 2011

SE19

Review of Recommendations developed by SE19. 1 recommendation was published in May 2010, 4 remaining recommendations to be considered by SE19

Y

SE19_24

Coordinated inputs to ITU-R: WP5C

Coordination of contributions related to FS channel arrangements to ITU-R F series recommendations

T: Dec 2010

SE19

 

Y

SE19_25

FS in Europe - Current use and future trends Post-2011

Revision of the ECC Report 003

S: May 2010

T: Sep. 2011

SE19

Requested by the ECC in 2010

Y

SE21_9

Coordinated inputs to ITU-R: WP1A

Coordination of contributions related to unwanted emission issues  to ITU-R  WP 1A.

T: Dec 2010

SE21

 

Y

SE21_14

Revision of ERC REC 74-01

Revision of ERC REC 74-01 taking into account in particular the outcome of the WRC07. Liaise directly with ETSI.

Additional deliverable: ECC Report on the impact of radar spurious emissions on other radiocommunication services/systems.

S: May 2008

T: Jan 2011

SE21

Expected contributions from ETSI.

 

Y

SE24_23

SRD: maximising spectrum use efficiency

Study of means of increasing utility of current LBT/AFA techniques with the aim of maximising spectrum use by SRDs.

S: Jun 2007

T: May 2011

SE24

Coordination with SRD MG for the band 863-870 MHz. ECC Report

On going

 

Y

SE24_27

Additional Compatibility Studies relating to PWMS in the L-band excluding the band 1544 – 1545 MHz

Consideration of the feasibility of implementing the DAA in PWMS.

Develop compatibility studies in bands not covered by draft ECC Report 121 as identified by WG FM, if any.

S: May 2008

T: May 2010

SE24

ECC Report 147 is ispublished. WI is closed.

Y

SE24_28

Studies relating to UWB as described in Annex to CEPT Report 34 (excluding Airborne UWB).

 

ECC Report

S: Sep 2009

T: May 2011

SE24

Support to FM47 – ETSI SRDoc: see doc. FM47(09)008, FM47(09)012, FM47(09)013,

See CEPT Report 34. Working document under development.

Y

SE24_31

Compatibility studies on automotive short range radars in the 24-29 GHz range

Support to WG FM on the EC mandate on SRR. This includes the investigation of the impact of the following two automotive radar systems on radio services/systems

-          UWB SRR in the band 24-29 GHz,

-          WLAM systems in the band 24.05-24.5 GHz.

WG SE is considering developing ECC Report(s) in order to retain the new material.

S: Jan 2009

T: Jan 2011

SE24

Info004SE(09)-Proposed overall work plan on SRR and ETSI draft SRDoc on SRR 24-29 GHz (TR 102 664 v1.1.1_0.0.7).

ECC Report on SRR and WLAM under development

 

Y

SE24_32

RLAN on board aircraft

Compatibility between RLAN on board aircraft and ground based radar in the bands 5250-5350 MHz and 5470-5725 MHz.

S: Jan 2009

T: May 2010

SE24

ECC Report 140 is published. WI is closed.

Y

SE24_33

Surveillance Radar Systems

Compatibility between Surveillance Radar Systems and other services/systems in the band 76-77GHz also considering the adjacent band

S:June 2010

T: May 2011

SE24

 Reactivated in June 2010

Y

SE24_34

Low Power Active Medical Implants (LP-AMI)

ECC Report / Support to WG FM (SRD-MG)

S: May 2009

T: Sep 2010

SE24

Draft ECC Report sent for PC

Y

SE24_35

Airborne UWB in the frequency bands 3.1 - 4.8 GHz and 6 - 8.5 GHz

ECC Report

S: Sep 2009

T: May 2011

SE24

Support to FM47 – ETSI SRDoc: see doc. FM47(09)015.

SeeCEPT Report 34. Working document under development.

Y

SE40_2

Coordinated inputs to ITU-R

Preparation of technical contributions to ITU-R WP4A, WP 7B, WP 7C and WP5B, WP4C on issues within the ToR of SE40.

S: Jun 2004

T: Nov 2011

SE40

 

 

SE40_13

RDSS at 2.5 GHz

Support of the CPG-PTD on the agenda item 1.18 To liaise directly to CPG-PTD.

ECC Report

 

S: May 2008

T: Sept. 2010

SE40

Sharing studies between RDSS and other services in the band 2483.5 – 2500 MHz (FS, MS, MSS (space to earth) and Radiolocation).

Draft ECC report sent to PC.

Y

SE40_14

Introduction of CGC of MSS in bands 1610-1626.5 MHz and 2483.5 -2500 MHz

To facilitate the introduction of Complementary Ground Component in the mobile satellite service bands with the goal to identify and consider any technical implications. Advise WG FM on the compatibility and/or necessary constraints.

S: May 2008

T: Jan  2011

SE40

Issues identified include the compatibility with other services in the same bands; with other MSS systems in the same bands; with services in adjacent bands.

Y

SE40_15

Introduction of CGC of MSS in bands 1518-1559 MHz, 1626.5-1660.5 MHz and 1668-1675 MHz

Response to FM 44. To facilitate the introduction of Complementary Ground Component in the mobile satellite service bands with the goal to consider any technical implications. Advise FM 44 on the compatibility and/or necessary constraints.

S: Sep 2008

T: Jan 2011

SE40

Issues identified include the compatibility with other services in the same bands and with services in adjacent bands.

Y

SE40_16

Support to FM 44 on RNSS pseudolite.

LS to FM 44 and revision of ECC Report 128.

S: Sep 2009

T: Jan 2011

SE40

To provide support FM 44 as appropriate on the development of measure related to RNSS pseudolite in particular for indoor use.

LS sent to FM44 with results.

Y

SE40_17

Compatibility between specific meteorological radars at 24 and 35 GHz and other systems in existing services in this band and adjacent bands.

ECC report

S: May 2010

T: May 2011

SE40

Provide the relevant conditions under which these meteorological radars could operate while ensuring coexistence with existing services.

 

SE42_4

Work in response to  the EC Mandate on the 2 GHz bands

Draft CEPT Report covering:

- Task 1: Summarise national experience with implementation of the WAPECS approach, in particular on BEMs so far.

 

- Task 2: identify the common and minimal technical conditions in the 2 GHz bands

S: Sept 2009

T: May 2010

SE42

ECC PT1 (Task 1 only)

PC on CEPT Report 39 completed. WI to be closed after final approval scheduled for the ECC meeting in June 2010.

 

Y

SE43_01

define technical and operational requirements for the operation of cognitive radio systems in the white spaces of the UHF broadcasting band (470-790 MHz) to ensure the protection of incumbent radio services/ systems and investigate the consequential amount of spectrum potentially available as “white space”;

ECC Report

 

 

S: May 2009

T: Jan 2011

SE43

 

Status report presented in May 2010. Completion of the studies by SE43 expected in September 2010.  

 

Y

STG_1

SEAMCAT

Technical support and development of SEAMCAT.

Continuous

ECO

STG

 

SEAMCAT-3 status reviewed. Further evolution (OFDM/Flash-OFDM) is progressing in STG. It also covers the promotion of the features of the SEAMCAT software (e.g. through contribution to the ITU-R)

Y

STG_2

Revision of ERC Report 68 and Inclusion of the WINNER  model

To revise the ERC Report 68 and to include the WINNER propagation. The WINNER module to be implemented in SEAMCAT.

S: May 2008

T: Sep 2011

ECO

STG

Reflect the latest update of SEAMCAT development in ERC Report 68. To consider the revision of the ITU-R Report SM 2028.

Y

SE_8

DFS Testing

Guidance to ETSI BRAN (possibly ECC Rep and/or contribution to ITU-R WP5A) about results of efficiency tests for DFS mechanism implemented in 5 GHz RLAN and BFWA to ensure co-existence with radars.

T: May 2011

WG SE

 

 

SE_9

Satellite MoU: observations

Provide assistance to the MoU on satellite monitoring on the observation of spectra of signal transmitted by different types of  satellites.

S: May 2004

T: 2011

 

Activities ongoing on IRIDIUM unwanted emission in SE40.

Y



[1] Target dates are seen as the intended date for the final approval of the related deliverable by the responsible entity. Internal deadlines for project teams and dates for the start of Public Consultations can be reflected in the remarks column. In general this implies that the draft deliverable should be completed by the project team one WG meting earlier for public consultation.  