Current work programme for WG SE

Go to ECO main page Print current page Send e-mail to ECO Map of this site Browse Meeting Documents Info on use of web

 

Source: 58th WGSE meeting, 24-28 January 2011, Cardiff, UK (SE(11)30-Annex05)

 

On-line ECC work programme base here  or alternatively see below:

 

WG SE Work Programme, January 2011 - May 2011 (including work items closed at the January 2011 WGSE meeting)

 

SE WP Ref#

Subject

Output

Start/Target dates[1]

Allocated

Remarks

ECO support (Y/N)

SE7_12

Practical guidance on co-ordination between GSM-R and public networks

ECC Report

S: Sep 2009

T: May 2011

SE7

Draft ECC Report 162 sent for PC

 

 

Y

SE7_13

Broadband Wireless Systems for 2300-2400 MHz

ECC report covering the two issues:

  • compatibility studies between BWS and existing services in the band 2300 – 2400 MHz and in adjacent spectrum bands.
  • development of appropriate measures to assist administrations in border coordination.

S: Sep 2010

T: Oct 2011

SE7

Coordination with ECC PT1 may be needed for BWS characteristics. BWS expected to be based on TDD in this band.

Y

SE7_14

Compatibility of DECT with systems in adjacent bands

Guidance to WGFM addressing the impact of directional antenna (up to 12 dBi gain) compared to 0 dBi antenna gain for licence exempted applications of DECT taking into account existing and future services in adjacent bands.

 

S: Jan 2011

T: Oct 2011

 

SE7

New task requested by WGFM.

Preliminary results should be available by May 2011. SE7 is to liaise with ECC PT1.

 

Y

SE19_22

High Altitude Platform Stations (HAPS) in the range 5 850- 7 075 MHz

Support of the WRC-12 CPG-PTD agenda item 1.20. To liaise directly to CPG-PTD.

Draft ECC Report.

S: May 2008

T: Jan 2011

SE19

ECC Report 156 published. WI is closed.

Y

SE19_23

Review of ECC/ERC Recommendations

Response to the mandate from WG FM.

S: Sep 2008

T: May 2011

SE19

Draft ECC REC(02)06 and associated ECC Report 163 sent for PC.

Y

SE19_24

Coordinated inputs to ITU-R: WP5C

Coordination of contributions related to FS channel arrangements to ITU-R F series recommendations

T: Dec  2011

SE19

Contributions sent to the November WP5C meeting

Y

SE19_25

FS in Europe - Current use and future trends Post-2011

Revision of the ECC Report 003

S: May 2010

T: Oct. 2011

SE19

On going

Y

SE19_26

Guidelines on technical aspects for coordination/licensing conditions currently used for PP systems

ECC Report and/or Recommendation

S: Jan 2011

T: Sep 2012

SE19

These guidelines are to improve the common understanding among various Administrations on the design and deployment of systems like RTPC/ATPC and/or “mixed-mode” (adaptive modulation) etc...

 

Y

SE21_9

Coordinated inputs to ITU-R: WP1A

Coordination of contributions related to unwanted emission issues  to ITU-R  WP 1A.

T: Dec 2011

SE21

 

Y

SE21_14

Revision of ERC REC 74-01

Revision of ERC REC 74-01.

Additional deliverable: ECC Report on the impact of radar spurious emissions on other radiocommunication services/systems.

S: May 2008

T: Jan 2011

SE21

Revision of the ERC REC 74-01 and ECC Report 157 approved for publication. WI is closed

 

Y

SE21_15

Revision of CEPT ECC Recommendation 02-05 “Unwanted emissions”

Revision of CEPT ECC Recommendation 02-05, in particular to update the references according with the outcome of the WRC07

S: Sep 2010

T: Sep 2012

SE21

On going. Scheduled based on the WP1A revision on REC ITU-R SM. 1541-2 Annex 8

Y

SE21_16

Compatibility between radars in 2700-2900 MHz and mobile service in the band 2500-2690 MHz

New ECC Report that would provide mitigation techniques to facilitate the compatibility between radars and mobile around 2.7 GHz.

S: Sep 2010

T: April 2012

SE21

Preliminary results required for May 2011

Y

SE24_23

SRD: maximising spectrum use efficiency

Study of means of increasing utility of current LBT/AFA techniques with the aim of maximising spectrum use by SRDs.

S: Jun 2007

T: April 2012

SE24

Coordination with SRD MG for the band 863-870 MHz. ECC Report

On going

 

Y

SE24_28

Studies relating to UWB as described in Annex to CEPT Report 34 (excluding Airborne UWB).

 

ECC Report

S: Sep 2009

T: Oct 2011

SE24

On going. Status report was provided to FM47. LS sent to ECC PT1 on measurements.

Y

SE24_31

Compatibility studies on automotive short range radars in the 24-29 GHz range

Support to WG FM on the EC mandate on SRR. This includes the investigation of the impact of the following two automotive radar systems on radio services/systems

-          UWB SRR in the band 24-29 GHz,

-          WLAM systems in the band 24.05-24.5 GHz.

 

S: Jan 2009

T: May 2011

SE24

Draft ECC Report 158 on SRR at 26 GHz published. Draft ECC Report 164 on WLAM sent for PC.

 

Y

SE24_33

Surveillance Radar Systems

Compatibility between Surveillance Radar Systems and other services/systems in the band 76-77GHz also considering the adjacent band

S: June 2010

T: April 2012

SE24

 

Y

SE24_35

Airborne UWB in the frequency bands 3.1 - 4.8 GHz and 6 - 8.5 GHz

ECC Report

S: Sep 2009

T: April 2012

SE24

Support to FM47

Y

SE24_36

Possible extension of the limit for SRD given in Annex 1 to Rec. 70-03 from the existing range 61-61.5 GHz to a larger frequency range (up to 57 – 66 GHz)

Guidance to SRDMG on the revision of the Rec. 70-03

S: January 2011

T: April 2012

 

In response to a request from SRD-MG

Y

SE40_2

Coordinated inputs to ITU-R

Preparation of technical contributions to ITU-R WP4A, WP 7B, WP 7C and WP5B, WP4C on issues within the ToR of SE40.

S: Jun 2004

T: Oct 2011

SE40

 

 

SE40_14

CGC of MSS in bands 1610-1626.5 MHz and 2483.5 -2500 MHz

To facilitate the introduction of Complementary Ground Component in the mobile satellite service bands with the goal to identify and consider any technical implications. Advise WG FM on the compatibility and/or necessary constraints.

S: May 2008

T: May  2011

SE40

Draft ECC Report 165 sent for PC

Y

SE40_15

CGC of MSS in bands 1518-1559 MHz, 1626.5-1660.5 MHz and 1668-1675 MHz

Response to FM 44. To facilitate the introduction of Complementary Ground Component in the mobile satellite service bands with the goal to consider any technical implications. Advise FM 44 on the compatibility and/or necessary constraints.

S: Sep 2008

T: May 2011

SE40

To be closed in May 2011 if no contributions have been received.

Y

SE40_16

Support to FM 44 on RNSS pseudolite.

LS to FM 44 and revision of ECC Report 128.

S: Sep 2009

T: April 2012

SE40

Results on indoor pseudolite sent to FM44. Additional work to be carried out on pulsed and outdoor pseudolite.

Y

SE40_17

Compatibility between specific meteorological radars at 24 and 35 GHz and other systems in existing services in this band and adjacent bands.

ECC report

S: May 2010

T: May 2011

SE40

Draft ECC Report 164 sent for PC.

N

SE40_18

Compatibility between ECN and MSS terminals at 2 GHz

ECC Report

S: Sep 2010

T: Oct 2011

 

SE40

Verify if the conclusions of the ERC Report 065 are still valid when taking into account the characteristics of MSS terminals contained in EN 302 574-2 and EN 302 574-3

Liaise with ETSI and ECC PT1.

Y

SE40_19

Support to FM44 on FSS terminals in Ka-band on mobile platforms

Liaison with FM44 and ETSI

S: Jan 2011

T: April 2012

 

SE40

·    Impact of BSS feeder links in 17.3-17.7 GHz on these FSS terminals ;

·    Impact of these FSS terminals into the FS in the band 28.8365-28.9485 GHz.

·    Difference between these terminals and stationary uncoordinated FSS Earth stations

Y

SE43_01

define technical and operational requirements for the operation of cognitive radio systems in the white spaces of the UHF broadcasting band (470-790 MHz) to ensure the protection of incumbent radio services/ systems and investigate the consequential amount of spectrum potentially available as “white space”;

ECC Report

 

 

S: May 2009

T: Jan 2011

SE43

ECC Report 159 published. WI is closed 

 

Y

SE43_02

Further definition of technical and operational requirements for the operation of White Space Devices in the band 470-790 MHz taking into account  Chapter 11 of ECC Report 159.

Revision of ECC Report 159 and/or new ECC Report(s)

S: Jan 2011

T: Sept 2012

SE43

The following issues need to be addressed in a shorter timeframe:

- Elaboration of the approach(-es) combining the geo-location database and spectrum sensing;

- Studies on the impact from WSD on services in the bands adjacent to the 470-790 MHz band;

- Identification of a common set of the parameters to calculate location specific WSD power levels.

Y

STG_1

SEAMCAT

Technical support and development of SEAMCAT.

Continuous

ECO

STG

 

SEAMCAT-3 status reviewed. Further evolution is planned in STG. Promotion of the features of the SEAMCAT software (e.g. through contribution to the ITU-R)

Y

STG_2

Revision of ERC Report 68 and Inclusion of the WINNER  model

To revise the ERC Report 68 and to include the WINNER propagation. The WINNER module to be implemented in SEAMCAT.

S: May 2008

T: April 2012

ECO

STG

Reflect the latest update of SEAMCAT development in ERC Report 68 and the SEAMCAT Handbook. To consider the revision of the ITU-R Report SM 2028.

Y

SE_8

DFS Testing

Guidance to ETSI BRAN about results of efficiency tests for DFS mechanism implemented in 5 GHz RLAN and BFWA to ensure co-existence with radars.

T: May 2011

WG SE

 

 

SE_9

Satellite MoU: observation of satellite signals by Leeheim

- Specification of measurement request

- Draft ECC Report developed by SE40 on the 2010 measurements of IRIDIUM unwanted emission in the 1610.6-1613.8 MHz RAS band.

S: May 2004

T: Sept 2012

 

Activities ongoing on IRIDIUM unwanted emission in SE40.

Y

SE_10

Cooperation with R&TTE-CA and ADCO

-Response to requests from R&TTE CA;

-Guidance on cases where administrations have faced difficulties with opinion from Notified Bodies.

S: Jan 2011

T: Sept 2012

WGSE

 

Y

 



[1] Target dates are seen as the intended date for the final approval of the related deliverable by the responsible entity. Internal deadlines for project teams and dates for the start of Public Consultations can be reflected in the remarks column. In general this implies that the draft deliverable should be completed by the project team one WG meting earlier for public consultation. 

Related Links

WGSE meeting documents

List of meetings within ECC

Main WGSE page

Main SEAMCAT page

ECC-ETSI co-operation

History of WGSE, photo gallery