|
ECP No. |
Title of the ECP |
Status |
RRC Doc. No |
| 1 |
Frequency planning for digital terrestrial broadcasting service for RRC 04/05 |
Adopted |
ECP01 |
| 2 |
Time schedule |
Adopted |
ECP02 |
| 4 |
Plans connected to the agreement |
Adopted |
ECP04 |
| 5 |
Planning scenarios |
Adopted |
ECP05 |
| 6 |
Consideration of planning methods |
Adopted |
ECP06 |
| 7 |
Coexistance of T-DAB and DVB-T in Band III |
Adopted |
ECP07 |
| 8 |
Protection of analogue and digital broadcasting in the preparation and implementation of the new digital plan - transition from analogue to digital terrestrial broadcasting |
Adopted |
ECP08 |
| 9 |
DVB-T network structures and reception modes to be used in frequency planning for RRC 04/05 |
Adopted |
ECP09 |
| 10 |
T-DAB network structures and reception modes to be used in frequency planning for RRC 04/05 |
Adopted |
ECP10 |
| 11 |
Channel bandwidth and channel raster for T-DAB in Band III |
Adopted |
ECP11 |
| 12 |
Technical criteria for DVB-T and T-DAB allotment planning |
Adopted |
ECP12 |
| 13 |
Field strength prediction method for Band III, IV and V |
Adopted |
ECP13 |
| 14 |
Definition of existing and planned analogue and digital broadcasting assignments/allotments |
Adopted |
ECP14 |
| 15 |
Data related to broadcasting required for the RRC |
Adopted |
ECP15 |
| 16 |
Consideration of Other Services |
Adopted |
ECP16 |
| 17 |
Outline of regulatory procedures required to implement the agreement |
Adopted |
ECP 17 |
|
18
App. 1-6
App. 7 |
Resolutions and report to the second session of the conference
Appendices 1 - 7 to ECP 18 |
Adopted |
ECP18 |